CONSTRUCTION AND DEVELOPMENT CORPORATION
 

Expertise in the field of construction involving Welding and Quality Control has always been the forte of the Company. Because of the orientation of the Company’s key personnel towards quality, having been involved in the quality control of international projects, it is not surprising that the end result would be projects of high quality and meeting even the high standards of the international market.  With the local market opening up a opportunities for a group able to handle specialized construction, it is only natural that the Company would easily establish itself in this area.



 

FILMINERA RESOURCES CORPORATION
- Design & Engineering Services for FILMINERA RESOURCES

  CORPORATION - Various Mining Facilities for MGP, Brgy. Puro,

  Aroroy, Masbate. (Completed 2012)

- Construction of FILMINERA RESOURCES CORPORATION -

  Various Mining Facilities for MGP, Brgy. Puro, Aroroy, Masbate.

  (Completed 2013)

- Installation of FILMINERA RESOURCES CORPORATION - Steel

  Culvert Installation Works. (Completed 2015)

 

LEIGHTON CONTRACTOR'S (ASIA) LTD.
- Erection of 8-units CIL Tank for P2324 - Masbate Gold Project

- Erection of 15-units Small Processed Tank for P2324 - Masbate

  Gold Project.

- Welding of various processing and pipelines within the plant.

- Welding of 15km tailings lines from plant to Paniqui area.

- Welding of large diameter water line at Guinobatan dam area.

- Erection of power plant structural building for 30MW Power Plant.

- Welding of various power plant pipelines.

- Erection of 10-units Power Plant Day Tanks.

- Erection of 5-units 40m Steel Chimney complete with structural

  support.

- Supply, Fabrication & Erection for NLEX Structural Toll Plaza.

 

FCF MINERALS CORPORATION
- Fabrication & Installation of SP69 Stainless Steel Piping Works.

  (Completed 2015)

- Supply, Fabrication and Installation of C26 Goldroom Structural

  Steel, Mechanical, Architectural, Piping & Other Works (SMAP).

  (Completed 2015)

- Construction of Civil Works Packages for Runruno Gold 

  Molybdenum Project.

  (Completed 2015)

- Supply, Fabrication and Installation of SP78 Stainless Steel Tanks.

  (Completed 2015)

- Supply and Fabrication of MSP 001 Tailings Pipeline Cast Ins,

  Spools & Pipe Supports. (Completed 2015). 

- Design, Supply, Fabrication & Installation of MCC Substations

  (Crushing, Reagents, Flotation & Air Services Areas)

  (Competed 2015)

- Supply, Fabrication & Installation of C35 Assay Laboratory.

  (Completed 2015) 

- Fabrication& Erection of 20.0m dia. X 12.5M Site return Water Tank

  for Runruno Gold Molybdenum Project. (Completed 2014)
 

PILIPINAS SHELL PETROLEUM CORP.
- Isolation & Pressure Testing Works of Fuel Pipeline at West-Loop of

  NAIA-IPT.

- Construction & Erection of One (1) unit 800KL Capacity FWT at

  Shell-Calapan Depot, Calapan, Mindoro.

- Piping & Mechanical Works for WOPL & BOPL Cargoline Re-

  Routing Project at Shell Poro Depot - San Fernando, La Union.

- Dismantling / Re-construction of Tank S-3 at Shell-Pasacao Depot,

  Camarines Sur.

- Piping & Mechanical Works for Additive Injection System at Shell-

  Curimao Depot - Ilocos Norte

- Piping & Mechanical Works for Fire Water Reservoir at Shell-

  Curimao Depot - Ilocos Norte

- New Tank and Piping Construction (Tank-5) in Shell-Palau Terminal - Koror, Palau. (September 2006 to October 2007) 

- Fire Fighting System Upgrade (FFSU) & Palau Bunkering System

  (PBS) Installation - Shell-Palau Terminal - Koror, Palau (May 2007 to

  July 2008)

- Bacolod Tank 10 - Dismantling & Reconstruction of 9.2mØ x 15m

  ULG Tank. (January 2011 - October 2011

 

READ MORE OF OUR PROJECTS HERE

 

 

PHILIPPINE GOLD PROCESSING & REFINING CORP.
- Supply, Fabrication and Installation of Tailings Line Upgrade -

  Structural Steel Support & Installation of Piping Works.

- Supply & Construction of Lead Nitrate Dosing Facility. (Completed

  2015)

- Supply & Installation of Lead Nitrate Piping Works. (Completed

  2015) 

- Supply & Installation of MCC Shed.

- Fabrication and Erection of Various Tanks for the Waste Treatments

  Plant. (Completed 2014)

- Fabrication and Installation of Various Piping System for Waste

  Treatment Plant. (Completed 2015)

- Design, Supply, Fabrication & Installation of 500 Tonnes Sulfuric

  Acid Storage Tank 7.0m Ø x 7.2 High. (Completed 2015)

- Design and Construction of Peroxide Bund Area and Isolated

  Foundation. (Completed 2015)

- Supply, Fabrication and Installation Works for Tailings Disposal

  Tank - Retrofitting of Shell Plates. (Completed 2012

- Extensive repair, replacement, improvement and rehabilitation of 1

  unit Diesel Fuel Tank (13.6m Ø x ± 12 m H) and 2 units Heavy Fuel

  Tank (13.6m Ø x ± 13.2m H) including pipelines, oil separator, tank

  farm unloading platform and construction of new unloading platform

  at the Causeway.